TECHNICAL PARAMETER
*Export Limitation for Growatt Single Phase Inverters (MIC/MIN series)
1. Growatt smart meter is need, the meter standard with 5 meters CT cable and 15 meters RS485 cable
2. Install the single phase meter at the grid connection point,after the household meter
3. Set the export limit function through inverter LCD &Touch key or through ShinePhone APP
APPLICATION
SIMPLE AND EASY TO USE
Touch key and OLED display
Type II SPD on DC side
Support export control
EFFICIENT POWER GENERATION
Max. efficiency 98.4%
DC/AC ratio upto 1.4
Dual MPP trackers
STRONG ADAPTABILITY
Battery ready(XH) interface extend to storage system at
anytime you want
+IoT make your energy smarter
*Indication of Meter Connection
The meter must be installed after the load, close to the grid side, the direction of electricity consumption is positive.
Please install the meter between the grid and the load. Follow the diagram to connect the No. 5 Pin (RS485A) of meter to the COM5 (ExportLimit-A) of inverter; connect the No. 6 Pin (RS485B) of meter to the COM6 (ExportLimit-B) of inverter.
The meter input terminal is connected to the grid end, and the meter output end is connected to the load side. The specific meter connection diagram is as follows:
*Indication of Meter Connection
The CT must be installed after the load, close to the grid side, the direction of electricity consumption is positive.
Please follow the diagram to connect the CT black & white wire to the inverter COM5: ExportLimit-A; connect the CT black wire to the inverter COM 6: ExportLimit-B.
The CT should be installed on the L line, and its arrow points from the grid side to the load.
The wiring diagram of the CT and inverter RS485 port communication is shown below: